Vicsa Construction

Kitchen remodeling in Modesto, CA

Vicsa Construction remodels kitchens in Modesto and nearby Stanislaus County towns. We handle the whole job under one licence: demolition, any layout or plumbing changes, cabinets, counters, backsplash tile, lighting and the final paint. You get a written price before work starts, and new customers get 10% off.

White kitchen with an island, three black stools, floating wood shelves and a stainless range hood

What the job includes

  • Design help and a plan drawn to scale before demolition
  • Cabinets, islands and open shelving, built or installed
  • Quartz or stone counters, backsplash tile and flooring
  • Moving sinks, gas lines and outlets when the layout changes
  • Permits, inspections and a final walkthrough with you

Who it is for

Homeowners who want more than a cabinet refresh: a wall taken down, an island added, a range moved to a better spot, or a kitchen that finally fits how the family cooks.

Finished kitchen with a grey quartz island, two white pendant lights and a patterned tile backsplash

What changes the price

We do not publish one price for every kitchen remodeling job, because no two rooms are the same. You get an exact, written price after the free estimate visit, before any work starts. New customers get 10% off that price.

Things that change the price of kitchen remodeling
FactorDetails
How much of the layout changesKeeping the sink and range where they are costs far less than moving them.
CabinetsStock boxes, semi-custom or built to measure.
Counter material and the number of cut-outs and seams
What we find behind the walls once they are open (we show you before we fix anything)

How we do kitchen remodeling

What a kitchen remodel with us looks like

We start at your house with a free estimate. We measure, look under the sink and in the crawl space, and ask how you use the room. Then we draw the new kitchen to scale, so you see where every cabinet, appliance and outlet goes before anything is torn out.

Once you approve the plan and the written price, we pull the permit, order cabinets and counters, and set a start date. Demolition, rough plumbing and electrical come first, then inspection, drywall, cabinets, counters, tile, fixtures and paint.

When walls are opened

Older Valley homes often hide a slow leak under the sink, an ungrounded circuit or a soft subfloor. When we find one, we stop, take photos, and give you a written change order with the price before we touch it. Nothing gets added to your bill as a surprise at the end.

Cabinets and carpentry in-house

Victor is a carpenter first. That means fillers, scribes, open shelves and trim get fitted on site instead of patched with caulk. If a stock cabinet does not fit an odd wall, we build the piece that does.

Kitchen island and white cabinets beside a black metal and glass stair guard
Open plan living and dining room with large sliding doors to a deck

Drawn first, then built to the drawing

Drag the handle. On the left is the plan view we work from, on the right the room as we finished it. Every cabinet, shelf and fixture lands where the drawing put it.

Finished kitchen with a grey quartz island, two white pendant lights and a patterned tile backsplashLine drawing of the kitchen in blueprint blueDrawnBuilt
Drawn image on the left of the handle, built image on the right.

Kitchen remodeling questions

Do I need a permit for a kitchen remodel in Modesto?

Yes, when the work moves or adds plumbing, gas lines, electrical circuits or walls. Swapping counters or cabinet doors in place usually does not need one. We pull the permit with the City of Modesto when your job needs it and include it in the price.

How long does a kitchen remodel take?

It depends on the scope and on cabinet lead times, which set most schedules. We give you a start date and a work schedule with the written estimate, and we tell you at once if a supplier delay changes it.

Can we keep using the kitchen during the remodel?

Not for most of it. We help you set up a temporary sink and counter elsewhere in the house, and we keep dust behind plastic sheeting so the rest of the home stays usable.

Do you give free estimates for kitchens?

Yes. The estimate is free and there is no commitment. New customers get 10% off the job.

Get a free kitchen remodeling estimate

Tell us about the job and we will call you back to set up a visit. The estimate is free, it comes in writing, and new customers get 10% off.

Call or text
(650) 922-0489
Hours
Mon to Sat, 7 a.m. to 5 p.m.
What are we building?

Free, no commitment. New customers get 10% off.